Agilent Technologies 6680A User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 156
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
14 Verification
Operation Verification Tests
Table 2-3 lists the requirements for operation verification, which is a subset of the performance tests.
Table 2-3. Operation Verification Tests
Test Refer To
1 Turn-On Checkout
Power Supply Operating Manual
2 Voltage Programming and Readback Accuracy
Table 2-4
3 Current Programming and Readback Accuracy
Table 2-5
Note: Record the results of Tests 2 and 3 in the appropriate Performance Test Record sheets
Performance Tests
Performance tests check all the specifications of the power supply. The tests are grouped into constant-voltage mode tests
(Table 2-4) and constant-current mode tests (Table 2-5).
Constant Voltage (CV) Tests
Test Setup
Connect your dc voltmeter leads to only +S and -S (see Figure 2-1), because the power supply regulates the voltage
between these points, not between the + and - output terminals .
Test Procedures
Perform the test procedures in Table 2-4. The CV tests are:
Voltage Programming and Readback Accuracy
CV Load Effect
CV Source Effect
CV Noise (PARD)
Transient Recovery Time
Note The tests are independent and may be performed in any order.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 155 156

Comments to this Manuals

No comments