Agilent Technologies 4294A Service Manual Page 160

  • Download
  • Add to my manuals
  • Print
  • Page
    / 249
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 159
152 7
Service Related Menus
DIAGNOSTIC TEST Menu
(230kHz) signal at a frequency bus node. It checks that each measured value is within
limits.
15: A2/A9 AC OSC LEVEL
Verifies the source circuit in the A2. This test measures the signal level at low frequencies
with the A/D converter in the A2. It checks that the measured value is within limits. It also
checks the floating section control signal of the A2.
16: A2/A9 DC BIAS LEVEL
Verifies the DC bias circuit in the A2. This test measures the DC bias level with the A/D
converter in the A2. It checks that the measured value is within limits. It also checks the
floating section control signal of the A2.
EXTERNAL TEST
This group of tests requires either external equipment and connections or operator
interaction to run. All return a “PASS” or “FAIL” indication on the display except the
external test 17.
17: FRONT PANEL
Checks the RGP and all front panel keys on the A30 keyboard. The abbreviated name is
displayed by pressing one of the keys or by rotating the RPG.
18: FLOPPY DISK DRIVE
Checks the FDD (Flexible Disk Drive). A formatted, blank disk is required. When this test
is started, a bit pattern is written onto the flexible disk. The pattern is then read back and
checked. This write pattern check is repeated from the low to high addresses.
19: 24 BIT I/O
Checks the 24-BIT I/O Port function on rear panel. This test requires I/O Port Test Kit (PN
87510-65002). For a more detailed procedure, refer to the Digital Control Troubleshooting.
20: ALL ANALOG
It consists of external tests 21 through 26.This test requires an OPEN termination
(42090A) or two BNC cables. The tests are done sequentially. If an external test is failed
while performing this test, it stops testing. It then displays the external test item which is
failed and the “FAIL” status. If all pass, it displays the “PASS” status. The internal test
ALL INT must be done and passed before this test is performed. At the end of the test, the
adapter selection of the analyzer is changed to the “NONE” status.
21: A8 IF
Checks the attenuator circuit in the A8. This test requires an OPEN termination (42090A)
or two BNC cables. It must be done before external tests 22, 23, 24, 25, or 26 are
performed. At the end of the test, the adapter selection of the analyzer is changed to the
“NONE” status.
22: A3 VCH / A8 FRONTEND
Checks the circuit in the A3 which senses the voltage across the DUT and transmits the
signal to the A8, it also checks the circuit in the A8 which transmits the signal to the 1st
mixer in the A8. This test requires an OPEN termination (42090A) or two NC cables. It
must be done before external tests 23, 24, 25, or 26 are performed. At the end of the test,
Page view 159
1 2 ... 155 156 157 158 159 160 161 162 163 164 165 ... 248 249

Comments to this Manuals

No comments